Project Information 
Type Transportation
Executive Architect GMWM - AECOM
Location Farwaniyah, Kuwait
Date 2017
Contractor Limak Construction
Design Architects Foster+Partners, Gulf Consult
Collaborators Metta, Stand, Probe, Werner Sobek
Stage Construction
Facts and Figures
Terminal Design Capacity 13 million passengers per year
Terminal Building Area 750,000 m²
Buildings Terminal Building, Central Plant Building, Water Tank Building and Supply Corridor

Aerial Perspective | © Foster+Partners

The terminal has a trefoil plan comprised of three symmetrical wings of departure gates is designed by Foster+Partners in collaboration with Gulf Consultants. AECOM and GMWM joined as Executive Architect for the contractor. The project is developed in LOD400 (level of detail) stage where a three-dimensional model is managed and updated in line with the highest integration of building components.
Architect
Manage presentations and attend weekly Design and BIM coordination meetings as the site representative of the Executive Architect.
Orchestrate workshops with the subcontractors as well as with the Engineer.
RFI Management.
Prepare project verification reports.
Manage Furniture, Signage and Binnacle packages that are closely associated with the terminal planning and processing areas as they require interdisciplinary coordination.
These responsibilities provided me with an in-depth knowledge of the entire project.​​​​​​​
Phase 1 Site Plan
Phase 1 Site Plan
Security | image © Foster+Partners
Security | image © Foster+Partners
Departures Hall | image © Foster+Partners
Departures Hall | image © Foster+Partners
Baggage Reclaim Hall | image © Foster+Partners
Baggage Reclaim Hall | image © Foster+Partners
Fixed Bridges | image © Foster+Partners
Fixed Bridges | image © Foster+Partners
BIM Model
BIM Model
Back to Top